Site Lighting: what bids leave out

Site lighting bids can split the job in strange places. One bidder carries the poles, fixtures, concrete pole bases, trenching, conduit, wire and controls. Another quotes poles and fixtures only, assumes the concrete sub pours the bases, and leaves trenching and patching to the site contractor. Put every bid on the same scope before you compare.

Level your site lighting bids with this checklist →

Standard scope checklist

Send this to every bidder and ask them to mark each line Included, Excluded or give an Add $. Silence is not inclusion.

Sending it out? Use the free scope letter template to ask every bidder for line-item scope, inclusions, exclusions and alternates. Terms to know: exclusion, by others.

#Scope item
1Fixture schedule: count, type and mounting height
2Poles: height, material and finish
3Concrete pole bases: design, excavation, rebar and anchor bolts
4Building-mounted fixtures (if in scope)
5Photometric plan and lighting levels (check local code/AHJ)
6Trenching, conduit and backfill
7Boring under existing paving or drives
8Wire, pull boxes and grounding
9Circuits and breakers from the panel
10Controls: photocells, timers or lighting control system
11Light trespass and shielding requirements (check local code/AHJ)
12Utility coordination for any separate service
13Removal or relocation of existing poles
14Saw-cut and patch paving and curbs
15Restoration of landscaped areas
16Pole protection (bollards or raised bases) in parking areas
17Lifts and cranes for setting poles
18Aiming and night-time adjustment
19Permits and inspections
20Fixture and pole lead times
21Warranty on fixtures and drivers
22Sales tax, bond and prevailing wage

Common exclusions and how they are worded

ExclusionTypical wordingWhy it mattersTypical cost to cover
Pole bases
  • “Pole bases by others”
  • “Excludes concrete”
  • “Anchor bolts furnished only”
Pole bases need design, excavation, rebar and anchor bolts set to the pole's template. They often fall between electrical, concrete and site bids.TBD
Trenching & boring
  • “Trenching by others”
  • “Excludes boring”
  • “Excludes rock excavation”
Trenching is a big part of site lighting cost, and boring under existing paving costs more. Make sure one bid carries all of it.TBD
Paving & landscape repair
  • “Excludes patching”
  • “Excludes saw-cutting”
  • “Restoration by others”
Trenches through existing paving and lawn need patching. If nobody carries it, it lands on the owner at the end.TBD
Controls
  • “Photocell only”
  • “Excludes lighting controls”
  • “Excludes timers”
Some jurisdictions and owners want timers, dimming or a control system. A bid with a simple photocell isn't comparable to one with full controls.TBD
Photometrics
  • “Fixtures per plans only”
  • “Excludes photometric design”
  • “Excludes lighting calculations”
If the plans don't include a photometric layout, someone has to show the light levels work. Ask who provides it and whether the AHJ requires it.TBD
Existing poles
  • “Excludes removal of existing poles”
  • “Excludes relocation”
  • “Excludes demolition of existing bases”
Old poles and bases may need removal or relocation. Breaking out old bases takes time and equipment.TBD
Fixture substitutions
  • “Or equal”
  • “Fixture substitutions per availability”
  • “Manufacturer's standard finish”
Swapped fixtures may give less light or a different look. Compare the fixture models, not just the count.TBD
Pole protection
  • “Excludes bollards”
  • “Excludes raised bases”
Poles in parking areas get hit. Raised bases or bollards protect them, but only if somebody priced them.TBD
Permits & utility fees
  • “Permit fees by owner”
  • “Excludes utility charges”
  • “Excludes separate meter”
Permits, inspections and any separate utility service carry fees. Decide who pays them before award.TBD

“Typical cost to cover” is TBD. We will publish ranges only once we have real, sourced data. Until then, use your own estimate or a confirmed add price from a bidder.

Questions to ask bidders

  1. Does your price include the pole bases, including excavation, rebar and anchor bolts?
  2. Is all trenching, boring, conduit and backfill included?
  3. Who saw-cuts and patches paving and restores landscaped areas?
  4. What controls did you price: photocell, timers or a control system?
  5. Who provides the photometric layout, if one is needed?
  6. Are removal or relocation of existing poles and bases included?
  7. Are the fixtures you priced the exact models specified? If not, what changes?
  8. Are bollards or raised bases included for poles in parking areas?
Placeholder

Bid-ready site lighting contractors

Contractors who agree to price against the standard checklist above, with exclusions spelled out line by line. Listings are not live yet.

Featured listing

Your company · City, ST

Bids on the BidGaps checklist

Featured listing

Your company · City, ST

Bids on the BidGaps checklist

List your company →