Flooring: what bids leave out

Flooring bids are usually priced by the square yard or square foot, and the gaps hide in the prep. One bidder includes moisture testing, patching, leveling, rubber base, transitions and protection. Another prices material and install over a perfect slab and excludes everything underneath it. On a TI with an old slab, that difference can be the whole job.

Level your flooring bids with this checklist →

Standard scope checklist

Send this to every bidder and ask them to mark each line Included, Excluded or give an Add $. Silence is not inclusion.

Sending it out? Use the free scope letter template to ask every bidder for line-item scope, inclusions, exclusions and alternates. Terms to know: exclusion, allowance, alternate.

#Scope item
1Areas and floor types included (carpet tile, LVT, sheet vinyl, VCT, tile, sealed concrete)
2Products, colors and patterns per spec, or approved equal
3Quantities and waste factor
4Removal of existing flooring and adhesive
5Moisture and pH testing of the slab
6Moisture mitigation system if tests fail
7Floor prep: grinding, crack repair and patching
8Self-leveling underlayment
9Adhesives per manufacturer warranty
10Underlayment or cushion
11Wall base: rubber, tile or wood
12Transitions and reducer strips
13Stair treads, risers and nosings
14Walk-off mats and entry flooring
15Tile setting materials, grout and sealer
16Polished or sealed concrete (if in flooring scope)
17Furniture and equipment moves
18Phasing and after-hours work in occupied spaces
19Protection of finished floors
20Final cleaning and initial floor finish / wax
21Attic stock
22Sales tax, freight and bond

Common exclusions and how they are worded

ExclusionTypical wordingWhy it mattersTypical cost to cover
Floor prep
  • “Floor to be clean, flat and ready by others”
  • “Excludes floor prep”
  • “Minor patching only”
Most flooring problems start under the floor. A bid that assumes a perfect slab isn't comparable to one that prices grinding, patching and crack repair.TBD
Moisture testing & mitigation
  • “Excludes moisture testing”
  • “Excludes moisture mitigation”
  • “Not responsible for slab moisture”
High slab moisture can make adhesive fail and void the flooring warranty. Get testing priced, and get an add price for mitigation if results come back high.TBD
Leveling
  • “Excludes self-leveling underlayment”
  • “Leveling by others”
Uneven slabs show through resilient flooring. Self-leveler can add up fast across a large area.TBD
Removal of existing flooring
  • “Excludes demo of existing flooring”
  • “Excludes adhesive removal”
Old flooring and adhesive have to come up, and older adhesives may need testing before removal. Check whether demo or flooring carries it.TBD
Wall base & transitions
  • “Excludes base”
  • “Excludes transition strips”
Base and transitions are lots of small pieces. Leave them out and the job doesn't look finished.TBD
Furniture moves & phasing
  • “Space to be empty”
  • “Excludes furniture moving”
  • “Normal hours, single phase”
In occupied spaces, moving furniture and working nights adds real cost. Price the conditions you actually have.TBD
Stairs & specialty areas
  • “Excludes stair treads and nosings”
  • “Excludes entry mats”
Stairs, walk-off mats and tile areas are often priced separately or skipped. Check each floor type on the finish schedule.TBD
Protection & cleaning
  • “Excludes floor protection”
  • “Excludes final clean and finish”
New floors get damaged by trades working after the install. Decide who protects them and who does the final clean.TBD
Attic stock
  • “Excludes attic stock”
  • “Overage at owner's request”
Extra material matched to your dye lot makes future repairs easy. Ask for it up front.TBD

“Typical cost to cover” is TBD. We will publish ranges only once we have real, sourced data. Until then, use your own estimate or a confirmed add price from a bidder.

Questions to ask bidders

  1. What slab condition does your price assume? What floor prep is included?
  2. Is moisture testing included? What is your add price for mitigation if tests fail?
  3. Is self-leveling underlayment included, and over what area?
  4. Does your price include removing existing flooring and adhesive?
  5. Are wall base, transitions and stair nosings included?
  6. Does your price assume an empty space and normal working hours?
  7. Who protects the floors after install, and is final cleaning included?
  8. How much attic stock is included for each product?
Placeholder

Bid-ready flooring contractors

Contractors who agree to price against the standard checklist above, with exclusions spelled out line by line. Listings are not live yet.

Featured listing

Your company · City, ST

Bids on the BidGaps checklist

Featured listing

Your company · City, ST

Bids on the BidGaps checklist

List your company →